AMI’s team with CRW Engineering worked to complete the mechanical design and construction on this design build project. Work included the design and construction to repair and replace obsolete and leaking fuel components, including shut-off valves, issue pumps, and single point refueling nozzle, and redesign and fabrication of piping to correct flow restrictions and improve refueling system flow rates. AMI completed all prefabrications in our Anchorage shop prior to shipment to site.