AMI completed construction on the replacement of the primary fuel lines at Cold Bay, Alaska. The three pipelines (6” Jet A-50, 4” AvGas, and 4” Diesel) run 2800 lineal feet from the dock to the fuel storage tanks. Scope of work included demolition of existing pipelines and installation of new pipeline materials.