Mechanical Scope of work included all plumbing fixtures, equipment, and piping; all heating system equipment, specialties, piping, and seismic and vibration control; sound efficient heating and ventilation systems complete with new fan room including five new air handling units; sprinkler systems; existing boiler room renovation; demolition of the existing mechanical equipment and piping; balancing and commissioning; HVAC digital control system and mechanical insulation.