This project was the main phase of the five-level, 442,135 sf Concourse “C” addition at Ted Stevens International Airport in Anchorage, Alaska. Our scope of work included: installation of five 6,970,000 BTU gas-fired boilers capable of heating the entire existing and new facility with future expansion capabilities, two 400-ton cooling towers, two 400-ton capacity gas fired chillers, all plumbing systems, and all HVAC systems.